Our fiber network is being built one substation at a time across Central Florida Electric Cooperative's entire service territory. Construction will be completed in 4 major phases, with each phase broken down into smaller service zones. Factors like population density, the location of network access points, and much more goes into the design of the overall network. Connections to each substation subsequently built and throughout the entire area provide important redundancy and resiliency. Service will become available as fiber construction is completed in each "zone".